CPC H02G 7/05 (2013.01) [B65D 90/16 (2013.01); B66C 1/10 (2013.01)] | 27 Claims |
1. A conductor lift that may be mounted to the boom of a crane, aerial lift, or transport vehicle that is comprised of:
a central frame;
an elongate first extension arm capable of slidable engagement with, and removable connection to, the central frame;
at least a first removable connector capable of removably connecting one end of the first extension arm to the central frame;
an elongate second extension arm capable of slidable engagement with, and removable connection to, the central frame;
at least a second removable connector capable of removably connecting one end of the second extension arm to the central frame;
wherein when the first extension arm and the second extension arm are each removably connected to the central frame, they cooperate to form a temporary assembly that is temporarily held together by removable connectors;
wherein the temporary assembly will have a longitudinal axis spanning from the distal end of the first extension arm through the central frame and to the distal end of the second extension arm;
and wherein the temporary assembly may be assembled or disassembled solely by means of manual labor by slidably engaging each of the extension arms to the central frame and then removably connecting each of the extension arms to the central frame using only removable connectors.
|