CPC G07C 9/38 (2020.01) [G07C 9/00896 (2013.01); G08B 13/08 (2013.01); G08B 13/19669 (2013.01); G08B 13/19689 (2013.01); G07C 2209/08 (2013.01)] | 13 Claims |
1. An equipment controlling apparatus, comprising:
a storage section configured to store a first time frame within which a setting of an operation of a device disposed in a predetermined region is to be changed; and
a control section configured to control the device to change the operation between the first time frame set in advance in the storage section and a second time frame different from the first time frame.
|