CPC G06F 9/4881 (2013.01) | 20 Claims |
1. An automatic driving simulation task scheduling method, comprising:
constructing a network flow block diagram based on a cluster rack, a quantity of nodes and a quantity of processes, and encoding information of the network flow block diagram;
setting information of tasks to be simulated, and performing simulation task flow minimum path calculation via the network flow block diagram; and
updating a scheduling system state in real time according to a fairness strategy and a preemptive scheduling strategy, and scheduling based on the scheduling system state.
|