CPC B65B 35/10 (2013.01) [B65B 5/04 (2013.01); B65B 35/00 (2013.01); B65D 85/04 (2013.01); B65H 49/00 (2013.01); B65H 49/08 (2013.01); B65H 49/16 (2013.01); B65H 51/00 (2013.01); B65H 54/80 (2013.01); B65H 57/06 (2013.01); B65H 57/18 (2013.01); B65H 59/10 (2013.01); B65H 59/18 (2013.01); B65H 59/22 (2013.01); B65H 75/16 (2013.01); H01B 13/0003 (2013.01); B65H 2701/36 (2013.01); H02G 11/02 (2013.01); Y10T 29/49004 (2015.01); Y10T 29/49194 (2015.01); Y10T 29/53961 (2015.01)] | 20 Claims |
1. A method for laying multiple unbound conductors in a container, the method comprising:
receiving multiple conductors through a tension equalization fixture;
receiving, after receiving the multiple conductors through the tension equalization fixture, the multiple conductors at a monitoring station configured to monitor a length of each of the multiple conductors individually passing through the monitoring station;
receiving the multiple conductors at a variable speed drive capable of adjusting a speed at which each of the multiple conductors moves; and
receiving a same length of each of the multiple conductors at a container, wherein the container is rotating when it receives the multiple conductors.
|